How many boxed meals fit in FL-FF-22?
The source states approximately 120–200 boxes across 28 standard channels, with up to 32 channels. Actual capacity requires the final L × W × H dimensions, weight, rigidity and channel drawing.
Can it dispense soup and noodles without spilling?
The movable XY platform and horizontal delivery path are intended to reduce tipping. The actual sealed container must pass repeated full-load delivery and collection tests; no universal spill-free claim is made.
Can every meal be heated in under 75 seconds?
No. Under 75 seconds is a source reference. Starting temperature, portion mass, food composition, container material, heater configuration and safe endpoint must be validated for each approved recipe.
Is 55°C a safe serving or hot-holding temperature?
The source lists an optional heating temperature up to 55°C, but local food rules and recipe validation may require different endpoints. Foodline does not treat 55°C as universal proof of safe cooking, reheating or hot holding.
What temperature range does the machine provide?
The supplied sheet states 4–25°C, but this is not a universal fresh-food storage claim. The selected refrigeration/heating build must be tested against the exact products, loading condition, ambient temperature and operator food-safety plan.
Can the machine stop selling expired food?
Expiry blocking can be scoped only after the software, SKU date-entry method, operator permissions, clock settings and exception procedure are defined and tested.
Can it use card payment outside China?
WeChat Pay, Alipay and JD Pay are source-market references. The destination terminal, merchant account, protocol, mounting, network, refund behavior and approval must be confirmed separately.
Does the machine itself make the food operation compliant?
No. Product approval, cold chain, allergen information, loading, cleaning, monitoring and local operating permission remain project- and jurisdiction-specific.
What is required for an accurate quotation?
Share the destination, quantity, SKU dimensions, temperature workflow, payment terminal and installation conditions.
Can the machine use a local payment terminal?
The exact terminal, MDB version, mounting, merchant account, network and destination approval must be reviewed together.
Which compliance documents are included?
Documents are confirmed against the quoted model, BOM and destination. A logo or unrelated certificate is not treated as universal approval.
How are lead time and MOQ confirmed?
MOQ and production timing are stated after the configuration, artwork, buyer-supplied devices and acceptance scope are frozen.
Can spare parts ship with the machine?
A recommended spare-parts list can be prepared from the final BOM and packed with the machine or supplied later.