What changes the MOQ?

  • A standard machine with existing options may be considered differently from a new cabinet, custom delivery mechanism or private-label production run.
  • Artwork, molded parts, special electronics and certification work can introduce supplier minimums outside the machine assembly itself.
  • A sample order can validate products and payment, but its configuration must be recorded if later production should match.

What changes production time?

  • Channel engineering, refrigeration, UI language, payment-device preparation and API work add different approval steps.
  • Lead time should start only after specifications, artwork, payment and required buyer-supplied devices are confirmed.
  • Production time and transit time are separate; customs, destination handling and installation must also be planned.

Questions to put in the quotation

  • State whether the quoted time is after deposit, artwork approval or technical confirmation.
  • List buyer-supplied items and the deadline for delivering them to the factory.
  • Define what evidence releases the machine for packing and what happens if inspection finds a nonconformity.

A safer planning method

  • Ask for a dated milestone table: specification freeze, material readiness, assembly, test, inspection, packing and dispatch.
  • Keep a launch buffer for payment onboarding, customs, site readiness and operator training.
  • Do not promise an opening date using an estimate that excludes destination work.

Prepare a configuration review

Request a model-specific MOQ and milestone schedule instead of relying on a generic website number.

Request project guidance